Skip to content

Phase completion snapshot (2026-05-20)

Merged: PR #83 (cursor/refinement-call-check-57b4main).

Status vs master plan

Phase Status Notes
2e — Contracts + refinements Merged E0304 call-site requires, E0305 refinements, VC emit + proof corpus
2f — Lean in lic build Partial on main Open-VC gate on build; contracts_verify/ green; sqrt_open_bound intentionally open; Lean kernel optional via LI_BUILD_VERIFY_LEAN
Phase H M1 routing Partial on main match_routes.li exits 0; Python + Li oracles in run_httpd_config.sh
Docs Merged llvm-abi.md, proof-corpus-roadmap.md, refinement-types.md

Agent continuation

  1. Read proof-corpus-roadmap.md and provability-gaps.md (G-lean, G-vc).
  2. Run ./li-tests/run_all.sh contracts_verify and ./li-tests/run_httpd_config.sh.
  3. Next: float abs lemmas (sqrt_open_bound); TOML route table in Li; structured disjoint= (7d-c).
  4. Close superseded draft PRs #77, #78 if still open.